This is how I went about rebuilding the Koffer on the back of the truck as it was too small to live in. The ideas for the design were accumulated and formed over many years and the final design I put together in the winter of 2010. I started to strip out the old inside on 12 December 2010 and we cut off the roof on 17 December. We started the Steel construction on 15 December and the inside construction started on 28 January 2011. The major building finished 17 July.
Part 1: Inside Construction; Windows, Floor, Walls, (8 January - 8 February 2011)
Part 2: Inside Construction; Hemp, Electrics, Gas (9 February - 16 February 2011)
Part 3: Inside Construction; Battery, Water,Ceiling (17 February-25 February 2011)
Part 4: Inside Construction; Mounting Windows (26 February - 7 March 2011)
Part 5: Inside Construction; Wall, Table, Bed, Kitchen (8 March - 19 March 2011)
Part 6: Inside Construction; Rear Storage, Table Stereo (20 March - 18 April 2011)
Part 7: Inside Construction; Shower, Painting, Copper Pipe (19 March -8 May2011)
Part 8: Inside Construction; Buro, Ventilator, Shower (15 May - 17 July2011)
Part 9: Inside Construction; Door, Oven (17 July 2011 - 9 February 2012)
Part 10: Koffer Connection; (13 November - 20 December 2012)
Part 11: Koffer Electrics; (1 August 2013)